GoodPulaski County, Arkansas · 1.0 MI W SH107 · Structure no. 000000000023520
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected October 2023
- Type
- Culvert
- Concrete
- Length
- 28 ft
- 2 main spans
- Daily traffic
- 2,106
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
Jx Conway RD over Bayou Meto Relief is a concrete culvert carrying Jx Conway RD over Bayou Meto Relief in Pulaski County, Arkansas. It was built in 2013, so it is 12 years old, younger than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,106 vehicles a day, roughly 1% of them trucks, projected to reach 2,273 by 2007. The structure is 28 ft (8.5 m) long and 25 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Jx Conway RD over Bayou Meto Relief built?
It was built in 2013, making it 12 years old in 2025.
What condition is Jx Conway RD over Bayou Meto Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does Jx Conway RD over Bayou Meto Relief carry?
About 2,106 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is Jx Conway RD over Bayou Meto Relief?
The structure is 28 ft (8.5 m) long with a longest span of 12 ft (3.7 m) and a deck 25 ft wide.
Who owns Jx Conway RD over Bayou Meto Relief?
It is owned by the County Highway Agency.