Wood Road-Cr 1078 over Plum Bayou - Jeff CO
GoodPosted for loadJefferson County, Arkansas · 0.35 MI S SH 256-WRIGHT · Structure no. 000000000024218
- Built
- 2020
- 5 years old
- Condition
- Good
- inspected November 2024
- Type
- Other
- Steel
- Length
- 89 ft
- 1 main span
- Daily traffic
- 204
- 1987 count
- Owner
- County
- County Highway Agency
About this bridge
Wood Road-Cr 1078 over Plum Bayou - Jeff CO is a steel other carrying Wood Road-Cr 1078 over Plum Bayou - Jeff CO in Jefferson County, Arkansas. It was built in 2020, so it is 5 years old, younger than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 204 vehicles a day, roughly 1% of them trucks, projected to reach 258 by 2007. The structure is 89 ft (27.1 m) long and 21 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Wood Road-Cr 1078 over Plum Bayou - Jeff CO built?
It was built in 2020, making it 5 years old in 2025.
What condition is Wood Road-Cr 1078 over Plum Bayou - Jeff CO in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does Wood Road-Cr 1078 over Plum Bayou - Jeff CO carry?
About 204 vehicles per day (1987 count), of which roughly 1% are trucks.
How long is Wood Road-Cr 1078 over Plum Bayou - Jeff CO?
The structure is 89 ft (27.1 m) long with a longest span of 81 ft (24.7 m) and a deck 21 ft wide.
Who owns Wood Road-Cr 1078 over Plum Bayou - Jeff CO?
It is owned by the County Highway Agency.