US Bridges

Templeislandrd-Gfc over Canal

GoodPosted for load

Jefferson County, Arkansas · 1.23 MI S CR 6-HUMPHREY · Structure no. 000000000023676

Built
2014
11 years old
Condition
Good
inspected February 2025
Type
Other
Steel
Length
89 ft
1 main span
Daily traffic
10
2013 count
Owner
State
Other State Agency

About this bridge

Templeislandrd-Gfc over Canal is a steel other carrying Templeislandrd-Gfc over Canal in Jefferson County, Arkansas. It was built in 2014, so it is 11 years old, younger than the Arkansas average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.

It carries about 10 vehicles a day, projected to reach 12 by 2033. The structure is 89 ft (27.1 m) long and 18 ft wide. If it were closed, the detour would be 100 mi (161 km).

CarriesTempleislandrd-Gfc
CrossesCanal
Location1.23 MI S CR 6-HUMPHREY
RouteState Lands Road 445
Coordinates34.39532, -91.70755
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating22 US tons

Structure

Structure typeOther
MaterialSteel
DeckSteel plate
Main spans1
Design loadUnknown
Structure length89 ft (27.1 m)
Longest span70 ft (21.3 m)
Deck width18 ft (5.5 m)
Roadway width17 ft (5.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10 (2013)
Projected traffic12 by 2033
Trucks0%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed100 mi (161 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther State Agency
Maintained byOther State Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Templeislandrd-Gfc over Canal built?

It was built in 2014, making it 11 years old in 2025.

What condition is Templeislandrd-Gfc over Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.

How much traffic does Templeislandrd-Gfc over Canal carry?

About 10 vehicles per day (2013 count).

How long is Templeislandrd-Gfc over Canal?

The structure is 89 ft (27.1 m) long with a longest span of 70 ft (21.3 m) and a deck 18 ft wide.

Who owns Templeislandrd-Gfc over Canal?

It is owned by the Other State Agency.