US Bridges

SH 367/JACKSON Co. over White River Relief

Fair

Jackson County, Arkansas · 0.4 MI NE JCT SH 14 · Structure no. 000000000001885

Built
1934
91 years old
Condition
Fair
inspected July 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
886 ft
26 main spans
Daily traffic
2,800
2018 count
Owner
State
State Highway Agency

About this bridge

SH 367/JACKSON Co. over White River Relief is a steel stringer/multi-beam or girder carrying SH 367/JACKSON Co. over White River Relief in Jackson County, Arkansas. It was built in 1934, so it is 91 years old, older than the Arkansas average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,800 vehicles a day, roughly 1% of them trucks, projected to reach 2,845 by 2028. The structure is 886 ft (270.1 m) long and 26 ft wide. If it were closed, the detour would be 39.1 mi (63 km).

CarriesSH 367/JACKSON Co.
CrossesWhite River Relief
Location0.4 MI NE JCT SH 14
RouteState Highway 367
Coordinates35.6131, -91.29898
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50 US tons
Inventory rating30 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans26
Design loadH 15
Structure length886 ft (270.1 m)
Longest span34 ft (10.4 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,800 (2018)
Projected traffic2,845 by 2028
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed39.1 mi (63 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.7 million
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 367/JACKSON Co. over White River Relief built?

It was built in 1934, making it 91 years old in 2025.

What condition is SH 367/JACKSON Co. over White River Relief in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does SH 367/JACKSON Co. over White River Relief carry?

About 2,800 vehicles per day (2018 count), of which roughly 1% are trucks.

How long is SH 367/JACKSON Co. over White River Relief?

The structure is 886 ft (270.1 m) long with a longest span of 34 ft (10.4 m) and a deck 26 ft wide.

Who owns SH 367/JACKSON Co. over White River Relief?

It is owned by the State Highway Agency.