US Bridges

SH 367/JACKSON Co. over White River Relief

Fair

Jackson County, Arkansas · 1.05 MI SW JCT SH 14 · Structure no. 000000000001883

Built
1934
91 years old
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
1,055 ft
31 main spans
Daily traffic
1,800
2018 count
Owner
State
State Highway Agency

About this bridge

SH 367/JACKSON Co. over White River Relief is a steel stringer/multi-beam or girder carrying SH 367/JACKSON Co. over White River Relief in Jackson County, Arkansas. It was built in 1934, so it is 91 years old, older than the Arkansas average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,800 vehicles a day, roughly 1% of them trucks, projected to reach 815 by 2028. The structure is 1,055 ft (321.7 m) long and 26 ft wide. If it were closed, the detour would be 49.7 mi (80 km).

CarriesSH 367/JACKSON Co.
CrossesWhite River Relief
Location1.05 MI SW JCT SH 14
RouteState Highway 367
Coordinates35.60808, -91.32099
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53 US tons
Inventory rating32 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans31
Design loadH 15
Structure length1,055 ft (321.7 m)
Longest span34 ft (10.4 m)
Deck width26 ft (7.8 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,800 (2018)
Projected traffic815 by 2028
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed49.7 mi (80 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 367/JACKSON Co. over White River Relief built?

It was built in 1934, making it 91 years old in 2025.

What condition is SH 367/JACKSON Co. over White River Relief in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does SH 367/JACKSON Co. over White River Relief carry?

About 1,800 vehicles per day (2018 count), of which roughly 1% are trucks.

How long is SH 367/JACKSON Co. over White River Relief?

The structure is 1,055 ft (321.7 m) long with a longest span of 34 ft (10.4 m) and a deck 26 ft wide.

Who owns SH 367/JACKSON Co. over White River Relief?

It is owned by the State Highway Agency.