CR 9/PUMPKIN Cente over Hazel Creek Relief
FairDrew County, Arkansas · 3.02 MI S Oldwarrenrd-Wil · Structure no. 000000000023029
- Built
- 2006
- 19 years old
- Condition
- Fair
- inspected June 2024
- Type
- Other
- Steel
- Length
- 85 ft
- 1 main span
- Daily traffic
- 60
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
CR 9/PUMPKIN Cente over Hazel Creek Relief is a steel other carrying CR 9/PUMPKIN Cente over Hazel Creek Relief in Drew County, Arkansas. It was built in 2006, so it is 19 years old, younger than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 60 vehicles a day, roughly 1% of them trucks, projected to reach 61 by 2007. The structure is 85 ft (25.9 m) long and 18 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 9/PUMPKIN Cente over Hazel Creek Relief built?
It was built in 2006, making it 19 years old in 2025.
What condition is CR 9/PUMPKIN Cente over Hazel Creek Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does CR 9/PUMPKIN Cente over Hazel Creek Relief carry?
About 60 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is CR 9/PUMPKIN Cente over Hazel Creek Relief?
The structure is 85 ft (25.9 m) long with a longest span of 58 ft (17.6 m) and a deck 18 ft wide.
Who owns CR 9/PUMPKIN Cente over Hazel Creek Relief?
It is owned by the County Highway Agency.