US Bridges

CR 9/PUMPKIN Cente over Hazel Creek Relief

Fair

Drew County, Arkansas · 3.02 MI S Oldwarrenrd-Wil · Structure no. 000000000023029

Built
2006
19 years old
Condition
Fair
inspected June 2024
Type
Other
Steel
Length
85 ft
1 main span
Daily traffic
60
2018 count
Owner
County
County Highway Agency

About this bridge

CR 9/PUMPKIN Cente over Hazel Creek Relief is a steel other carrying CR 9/PUMPKIN Cente over Hazel Creek Relief in Drew County, Arkansas. It was built in 2006, so it is 19 years old, younger than the Arkansas average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 60 vehicles a day, roughly 1% of them trucks, projected to reach 61 by 2007. The structure is 85 ft (25.9 m) long and 18 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesCR 9/PUMPKIN Cente
CrossesHazel Creek Relief
Location3.02 MI S Oldwarrenrd-Wil
RouteCounty Highway 9
Coordinates33.53412, -91.93806
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59 US tons
Inventory rating35.1 US tons

Structure

Structure typeOther
MaterialSteel
DeckSteel plate
Main spans1
Design loadUnknown
Structure length85 ft (25.9 m)
Longest span58 ft (17.6 m)
Deck width18 ft (5.6 m)
Roadway width18 ft (5.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic60 (2018)
Projected traffic61 by 2007
Trucks1%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 9/PUMPKIN Cente over Hazel Creek Relief built?

It was built in 2006, making it 19 years old in 2025.

What condition is CR 9/PUMPKIN Cente over Hazel Creek Relief in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does CR 9/PUMPKIN Cente over Hazel Creek Relief carry?

About 60 vehicles per day (2018 count), of which roughly 1% are trucks.

How long is CR 9/PUMPKIN Cente over Hazel Creek Relief?

The structure is 85 ft (25.9 m) long with a longest span of 58 ft (17.6 m) and a deck 18 ft wide.

Who owns CR 9/PUMPKIN Cente over Hazel Creek Relief?

It is owned by the County Highway Agency.