US 167 S-7 Lm 7.36 over Moro Creek Relief
GoodDallas County, Arkansas · 3.14 MI No JCT SH 273 · Structure no. 000000000007240
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 121 ft
- 3 main spans
- Daily traffic
- 4,600
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
US 167 S-7 Lm 7.36 over Moro Creek Relief is a steel continuous stringer/multi-beam or girder carrying US 167 S-7 Lm 7.36 over Moro Creek Relief in Dallas County, Arkansas. It was built in 2014, so it is 11 years old, younger than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,600 vehicles a day, roughly 24% of them trucks, projected to reach 5,600 by 2032. The structure is 121 ft (36.9 m) long and 78 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 167 S-7 Lm 7.36 over Moro Creek Relief built?
It was built in 2014, making it 11 years old in 2025.
What condition is US 167 S-7 Lm 7.36 over Moro Creek Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does US 167 S-7 Lm 7.36 over Moro Creek Relief carry?
About 4,600 vehicles per day (2018 count), of which roughly 24% are trucks.
How long is US 167 S-7 Lm 7.36 over Moro Creek Relief?
The structure is 121 ft (36.9 m) long with a longest span of 46 ft (14 m) and a deck 78 ft wide.
Who owns US 167 S-7 Lm 7.36 over Moro Creek Relief?
It is owned by the State Highway Agency.