Bradley CR 54 Z-A over Halfway Creek
FairPosted for loadBradley County, Arkansas · 0.2 MI E JCT CR 33 · Structure no. 000000000020909
- Built
- 1990
- 35 years old
- Condition
- Fair
- inspected October 2024
- Type
- Other
- Steel
- Length
- 85 ft
- 1 main span
- Daily traffic
- 96
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
Bradley CR 54 Z-A over Halfway Creek is a steel other carrying Bradley CR 54 Z-A over Halfway Creek in Bradley County, Arkansas. It was built in 1990, so it is 35 years old, younger than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 96 vehicles a day, roughly 1% of them trucks, projected to reach 75 by 2007. The structure is 85 ft (25.9 m) long and 26 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bradley CR 54 Z-A over Halfway Creek built?
It was built in 1990, making it 35 years old in 2025.
What condition is Bradley CR 54 Z-A over Halfway Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Bradley CR 54 Z-A over Halfway Creek carry?
About 96 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is Bradley CR 54 Z-A over Halfway Creek?
The structure is 85 ft (25.9 m) long with a longest span of 76 ft (23.2 m) and a deck 26 ft wide.
Who owns Bradley CR 54 Z-A over Halfway Creek?
It is owned by the County Highway Agency.