US Bridges

Levert Rd. over Potato Patch Creek

Good

Perry County, Alabama · _co. Rd. 49 · Structure no. 021474

Built
2018
7 years old
Condition
Good
inspected January 2025
Type
Culvert
Concrete
Length
30 ft
2 main spans
Daily traffic
66
2018 count
Owner
County
County Highway Agency

About this bridge

Levert Rd. over Potato Patch Creek is a concrete culvert carrying Levert Rd. over Potato Patch Creek in Perry County, Alabama. It was built in 2018, so it is 7 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 66 vehicles a day, roughly 5% of them trucks, projected to reach 98 by 2038. The structure is 30 ft (9.1 m) long and 22 ft wide.

CarriesLevert Rd.
CrossesPotato Patch Creek
Location_co. Rd. 49
RouteCounty Highway 49
StateAlabama
Coordinates32.76479, -87.25003
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert9 ExcellentNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating89 US tons
Inventory rating53 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length30 ft (9.1 m)
Longest span30 ft (9.1 m)
Deck width22 ft (6.7 m)
Roadway width18 ft (5.5 m)
Vertical clearance over deck99 ft (30.2 m)

Traffic and service

Average daily traffic66 (2018)
Projected traffic98 by 2038
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$402,000 (2025 estimate)
NavigationNavigation control on waterway (bridge permit required)

Frequently asked questions

When was Levert Rd. over Potato Patch Creek built?

It was built in 2018, making it 7 years old in 2025.

What condition is Levert Rd. over Potato Patch Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does Levert Rd. over Potato Patch Creek carry?

About 66 vehicles per day (2018 count), of which roughly 5% are trucks.

How long is Levert Rd. over Potato Patch Creek?

The structure is 30 ft (9.1 m) long with a longest span of 30 ft (9.1 m) and a deck 22 ft wide.

Who owns Levert Rd. over Potato Patch Creek?

It is owned by the County Highway Agency.