US Bridges

AL-118 over New River

Fair

Marion County, Alabama · 6 MI E JCT SR 253 · Structure no. 012825

Built
1982
43 years old
Condition
Fair
inspected February 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
163 ft
1 main span
Daily traffic
1,395
2020 count
Owner
State
State Highway Agency

About this bridge

AL-118 over New River is a steel stringer/multi-beam or girder carrying AL-118 over New River in Marion County, Alabama. It was built in 1982, so it is 43 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,395 vehicles a day, roughly 10% of them trucks, projected to reach 1,600 by 2041. The structure is 163 ft (49.7 m) long and 43 ft wide.

CarriesAL-118
CrossesNew River
Location6 MI E JCT SR 253
RouteU.S. Route 118
StateAlabama
Coordinates33.93, -87.68036
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52.8 US tons
Inventory rating31.6 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHS 20
Structure length163 ft (49.7 m)
Longest span81 ft (24.7 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,395 (2020)
Projected traffic1,600 by 2041
Trucks10%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$1.9 million (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was AL-118 over New River built?

It was built in 1982, making it 43 years old in 2025.

What condition is AL-118 over New River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does AL-118 over New River carry?

About 1,395 vehicles per day (2020 count), of which roughly 10% are trucks.

How long is AL-118 over New River?

The structure is 163 ft (49.7 m) long with a longest span of 81 ft (24.7 m) and a deck 43 ft wide.

Who owns AL-118 over New River?

It is owned by the State Highway Agency.