County Highway 17 over Pea River Relief
FairGeneva County, Alabama · 4.0 MI S of Samson · Structure no. 016262
- Built
- 1995
- 30 years old
- Condition
- Fair
- inspected February 2025
- Type
- Channel Beam
- Concrete
- Length
- 549 ft
- 16 main spans
- Daily traffic
- 640
- 2025 count
- Owner
- County
- County Highway Agency
About this bridge
County Highway 17 over Pea River Relief is a concrete channel beam carrying County Highway 17 over Pea River Relief in Geneva County, Alabama. It was built in 1995, so it is 30 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 640 vehicles a day, roughly 5% of them trucks, projected to reach 765 by 2045. The structure is 549 ft (167.3 m) long and 31 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Highway 17 over Pea River Relief built?
It was built in 1995, making it 30 years old in 2025.
What condition is County Highway 17 over Pea River Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.
How much traffic does County Highway 17 over Pea River Relief carry?
About 640 vehicles per day (2025 count), of which roughly 5% are trucks.
How long is County Highway 17 over Pea River Relief?
The structure is 549 ft (167.3 m) long with a longest span of 34 ft (10.4 m) and a deck 31 ft wide.
Who owns County Highway 17 over Pea River Relief?
It is owned by the County Highway Agency.