US Bridges

CO RD 85 over Mortar Creek

Good

Autauga County, Alabama · 1/4 Mile S. of CSX RR · Structure no. 021054

Built
2017
8 years old
Condition
Good
inspected January 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
280 ft
7 main spans
Daily traffic
652
2016 count
Owner
County
County Highway Agency

About this bridge

CO RD 85 over Mortar Creek is a prestressed concrete stringer/multi-beam or girder carrying CO RD 85 over Mortar Creek in Autauga County, Alabama. It was built in 2017, so it is 8 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 652 vehicles a day, roughly 6% of them trucks, projected to reach 969 by 2036. The structure is 280 ft (85.3 m) long and 33 ft wide.

CarriesCO RD 85
CrossesMortar Creek
Location1/4 Mile S. of CSX RR
RouteCounty Highway 85
StateAlabama
Coordinates32.62061, -86.42468
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67 US tons
Inventory rating40.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans7
Design loadHS 20
Structure length280 ft (85.3 m)
Longest span40 ft (12.2 m)
Deck width33 ft (10 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deck0 ft (0 m)

Traffic and service

Average daily traffic652 (2016)
Projected traffic969 by 2036
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$2.3 million (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was CO RD 85 over Mortar Creek built?

It was built in 2017, making it 8 years old in 2025.

What condition is CO RD 85 over Mortar Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does CO RD 85 over Mortar Creek carry?

About 652 vehicles per day (2016 count), of which roughly 6% are trucks.

How long is CO RD 85 over Mortar Creek?

The structure is 280 ft (85.3 m) long with a longest span of 40 ft (12.2 m) and a deck 33 ft wide.

Who owns CO RD 85 over Mortar Creek?

It is owned by the County Highway Agency.