Co.Rd. 64 over Mortar Creek
GoodPosted for loadAutauga County, Alabama · Kelly Bottom · Structure no. 014610
- Built
- 1988
- 37 years old
- Condition
- Good
- inspected January 2025
- Type
- Channel Beam
- Concrete
- Length
- 68 ft
- 2 main spans
- Daily traffic
- 86
- 2005 count
- Owner
- County
- County Highway Agency
About this bridge
Co.Rd. 64 over Mortar Creek is a concrete channel beam carrying Co.Rd. 64 over Mortar Creek in Autauga County, Alabama. It was built in 1988, so it is 37 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 86 vehicles a day, roughly 10% of them trucks, projected to reach 128 by 2035. The structure is 68 ft (20.8 m) long and 26 ft wide. If it were closed, the detour would be 11.2 mi (18 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Co.Rd. 64 over Mortar Creek built?
It was built in 1988, making it 37 years old in 2025.
What condition is Co.Rd. 64 over Mortar Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does Co.Rd. 64 over Mortar Creek carry?
About 86 vehicles per day (2005 count), of which roughly 10% are trucks.
How long is Co.Rd. 64 over Mortar Creek?
The structure is 68 ft (20.8 m) long with a longest span of 34 ft (10.4 m) and a deck 26 ft wide.
Who owns Co.Rd. 64 over Mortar Creek?
It is owned by the County Highway Agency.