US Bridges

Dalton Highway over Marion Creek

Good

Yukon-Koyukuk Census Area, Alaska · Mile Point 179.4 · Structure no. 1438

Built
2003
22 years old
Condition
Good
inspected July 2024
Type
Tee Beam
Prestressed Concrete
Length
102 ft
1 main span
Daily traffic
140
2020 count
Owner
State
State Highway Agency

About this bridge

Dalton Highway over Marion Creek is a prestressed concrete tee beam carrying Dalton Highway over Marion Creek in Yukon-Koyukuk Census Area, Alaska. It was built in 2003, so it is 22 years old, younger than the Alaska average of 35.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 140 vehicles a day, roughly 62% of them trucks, projected to reach 560 by 2039. The structure is 102 ft (31.1 m) long and 35 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesDalton Highway
CrossesMarion Creek
LocationMile Point 179.4
RouteState Highway 65
StateAlaska
Coordinates67.31969, -150.16231
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating94.9 US tons
Inventory rating46.4 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length102 ft (31.1 m)
Longest span99 ft (30.2 m)
Deck width35 ft (10.6 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic140 (2020)
Projected traffic560 by 2039
Trucks62%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Dalton Highway over Marion Creek built?

It was built in 2003, making it 22 years old in 2025.

What condition is Dalton Highway over Marion Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Dalton Highway over Marion Creek carry?

About 140 vehicles per day (2020 count), of which roughly 62% are trucks.

How long is Dalton Highway over Marion Creek?

The structure is 102 ft (31.1 m) long with a longest span of 99 ft (30.2 m) and a deck 35 ft wide.

Who owns Dalton Highway over Marion Creek?

It is owned by the State Highway Agency.