US Bridges

South Tongass HWY over Front and Mill ST Viad

Good

Ketchikan Gateway Borough, Alaska · Mile Point 2.1 · Structure no. 1081

Built
1973
52 years old
Condition
Good
inspected June 2023
Type
Tee Beam
Prestressed Concrete
Length
357 ft
7 main spans
Daily traffic
6,830
2020 count
Owner
State
State Highway Agency

About this bridge

South Tongass HWY over Front and Mill ST Viad is a prestressed concrete tee beam carrying South Tongass HWY over Front and Mill ST Viad in Ketchikan Gateway Borough, Alaska. It was built in 1973, so it is 52 years old, older than the Alaska average of 35.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,830 vehicles a day, roughly 5% of them trucks, projected to reach 8,290 by 2039. The structure is 357 ft (108.8 m) long and 60 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSouth Tongass HWY
CrossesFront and Mill ST Viad
LocationMile Point 2.1
RouteState Highway 902
StateAlaska
Coordinates55.3408, -131.6463
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating60.5 US tons
Inventory rating28 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans7
Design loadHS 20
Structure length357 ft (108.8 m)
Longest span51 ft (15.5 m)
Deck width60 ft (18.3 m)
Roadway width45 ft (13.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,830 (2020)
Projected traffic8,290 by 2039
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was South Tongass HWY over Front and Mill ST Viad built?

It was built in 1973, making it 52 years old in 2025.

What condition is South Tongass HWY over Front and Mill ST Viad in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does South Tongass HWY over Front and Mill ST Viad carry?

About 6,830 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is South Tongass HWY over Front and Mill ST Viad?

The structure is 357 ft (108.8 m) long with a longest span of 51 ft (15.5 m) and a deck 60 ft wide.

Who owns South Tongass HWY over Front and Mill ST Viad?

It is owned by the State Highway Agency.