US Bridges

South Tongass HWY over Front Street Viaduct

Fair

Ketchikan Gateway Borough, Alaska · Mile Point 2.0 · Structure no. 1080

Built
1969
56 years old
Condition
Fair
inspected June 2023
Type
Tee Beam
Prestressed Concrete
Length
247 ft
5 main spans
Daily traffic
8,330
2020 count
Owner
State
State Highway Agency

About this bridge

South Tongass HWY over Front Street Viaduct is a prestressed concrete tee beam carrying South Tongass HWY over Front Street Viaduct in Ketchikan Gateway Borough, Alaska. It was built in 1969, so it is 56 years old, older than the Alaska average of 35.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 8,330 vehicles a day, roughly 5% of them trucks, projected to reach 10,100 by 2039. The structure is 247 ft (75.3 m) long and 60 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSouth Tongass HWY
CrossesFront Street Viaduct
LocationMile Point 2.0
RouteState Highway 902
StateAlaska
Coordinates55.3421, -131.6479
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.2 US tons
Inventory rating29.8 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length247 ft (75.3 m)
Longest span50 ft (15.2 m)
Deck width60 ft (18.3 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,330 (2020)
Projected traffic10,100 by 2039
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was South Tongass HWY over Front Street Viaduct built?

It was built in 1969, making it 56 years old in 2025.

What condition is South Tongass HWY over Front Street Viaduct in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does South Tongass HWY over Front Street Viaduct carry?

About 8,330 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is South Tongass HWY over Front Street Viaduct?

The structure is 247 ft (75.3 m) long with a longest span of 50 ft (15.2 m) and a deck 60 ft wide.

Who owns South Tongass HWY over Front Street Viaduct?

It is owned by the State Highway Agency.