US Bridges

Birchwood Loop RD over North Birchwood Oc

Fair

Anchorage Municipality, Alaska · Mile Point 6.2 · Structure no. 1450

Built
1983
42 years old
Condition
Fair
inspected July 2023
Type
Tee Beam
Prestressed Concrete
Length
254 ft
2 main spans
Daily traffic
4,350
2020 count
Owner
State
State Highway Agency

About this bridge

Birchwood Loop RD over North Birchwood Oc is a prestressed concrete tee beam carrying Birchwood Loop RD over North Birchwood Oc in Anchorage Municipality, Alaska. It was built in 1983, so it is 42 years old, older than the Alaska average of 35.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,350 vehicles a day, roughly 5% of them trucks, projected to reach 5,050 by 2039. The structure is 254 ft (77.3 m) long and 65 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesBirchwood Loop RD
CrossesNorth Birchwood Oc
LocationMile Point 6.2
RouteState Highway 559
StateAlaska
Coordinates61.40222, -149.46778
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating63.9 US tons
Inventory rating38.3 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckOther
Main spans2
Design loadHS 20
Structure length254 ft (77.3 m)
Longest span130 ft (39.6 m)
Deck width65 ft (19.7 m)
Roadway width54 ft (16.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,350 (2020)
Projected traffic5,050 by 2039
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Birchwood Loop RD over North Birchwood Oc built?

It was built in 1983, making it 42 years old in 2025.

What condition is Birchwood Loop RD over North Birchwood Oc in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does Birchwood Loop RD over North Birchwood Oc carry?

About 4,350 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is Birchwood Loop RD over North Birchwood Oc?

The structure is 254 ft (77.3 m) long with a longest span of 130 ft (39.6 m) and a deck 65 ft wide.

Who owns Birchwood Loop RD over North Birchwood Oc?

It is owned by the State Highway Agency.