SH Cnty RD 269 over Powder River
FairSheridan County, Wyoming · 16 Miles N. of Arvada · Structure no. FNH
- Built
- 1989
- 36 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 393 ft
- 3 main spans
- Daily traffic
- 121
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
SH Cnty RD 269 over Powder River is a steel continuous stringer/multi-beam or girder carrying SH Cnty RD 269 over Powder River in Sheridan County, Wyoming. It was built in 1989, so it is 36 years old, younger than the Wyoming average of 48.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 121 vehicles a day, roughly 9% of them trucks, projected to reach 169 by 2043. The structure is 393 ft (119.8 m) long and 29 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH Cnty RD 269 over Powder River built?
It was built in 1989, making it 36 years old in 2025.
What condition is SH Cnty RD 269 over Powder River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does SH Cnty RD 269 over Powder River carry?
About 121 vehicles per day (2024 count), of which roughly 9% are trucks.
How long is SH Cnty RD 269 over Powder River?
The structure is 393 ft (119.8 m) long with a longest span of 151 ft (46 m) and a deck 29 ft wide.
Who owns SH Cnty RD 269 over Powder River?
It is owned by the County Highway Agency.