US Bridges

18th Street over Canal No 2

PoorPosted for load

Platte County, Wyoming · Wheatland · Structure no. EXD

Built
1978
47 years old
Condition
Poor
inspected November 2024
Type
Channel Beam
Concrete
Length
36 ft
1 main span
Daily traffic
138
2024 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

18th Street over Canal No 2 is a concrete channel beam carrying 18th Street over Canal No 2 in Platte County, Wyoming. It was built in 1978, so it is 47 years old, younger than the Wyoming average of 48.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.

It carries about 138 vehicles a day, roughly 11% of them trucks, projected to reach 193 by 2043. The structure is 36 ft (11 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

Carries18th Street
CrossesCanal No 2
LocationWheatland
RouteCity Street 470-4
StateWyoming
Coordinates42.05422, -104.96678
Functional classRural Local

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck4 PoorAdvanced section loss, deterioration, spalling or scour.
Superstructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 12 months
Operating statusPosted for load restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.8 US tons
Inventory rating29.8 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length36 ft (11 m)
Longest span34 ft (10.4 m)
Deck width36 ft (11.1 m)
Roadway width35 ft (10.6 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic138 (2024)
Projected traffic193 by 2043
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$9,000
NavigationNo navigation control on waterway

Frequently asked questions

When was 18th Street over Canal No 2 built?

It was built in 1978, making it 47 years old in 2025.

What condition is 18th Street over Canal No 2 in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in November 2024.

How much traffic does 18th Street over Canal No 2 carry?

About 138 vehicles per day (2024 count), of which roughly 11% are trucks.

How long is 18th Street over Canal No 2?

The structure is 36 ft (11 m) long with a longest span of 34 ft (10.4 m) and a deck 36 ft wide.

Who owns 18th Street over Canal No 2?

It is owned by the Town or Township Highway Agency.