Na Cnty RD 412 over Mowrey Draw
FairPosted for loadNatrona County, Wyoming · 3 MI N.E. of Alcova · Structure no. FOC
- Built
- 1929
- 96 years old
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 70 ft
- 1 main span
- Daily traffic
- 165
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Na Cnty RD 412 over Mowrey Draw is a steel stringer/multi-beam or girder carrying Na Cnty RD 412 over Mowrey Draw in Natrona County, Wyoming. It was built in 1929, so it is 96 years old, older than the Wyoming average of 48.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 165 vehicles a day, roughly 9% of them trucks, projected to reach 231 by 2043. The structure is 70 ft (21.3 m) long and 21 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Na Cnty RD 412 over Mowrey Draw built?
It was built in 1929, making it 96 years old in 2025.
What condition is Na Cnty RD 412 over Mowrey Draw in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Na Cnty RD 412 over Mowrey Draw carry?
About 165 vehicles per day (2024 count), of which roughly 9% are trucks.
How long is Na Cnty RD 412 over Mowrey Draw?
The structure is 70 ft (21.3 m) long with a longest span of 36 ft (10.9 m) and a deck 21 ft wide.
Who owns Na Cnty RD 412 over Mowrey Draw?
It is owned by the County Highway Agency.