Na Cnty RD 402 over Corral Creek
FairPosted for loadNatrona County, Wyoming · 16 Miles S. of Casper · Structure no. DUH
- Built
- 1970
- 55 years old
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 36 ft
- 1 main span
- Daily traffic
- 24
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Na Cnty RD 402 over Corral Creek is a steel stringer/multi-beam or girder carrying Na Cnty RD 402 over Corral Creek in Natrona County, Wyoming. It was built in 1970, so it is 55 years old, older than the Wyoming average of 48.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 24 vehicles a day, roughly 8% of them trucks, projected to reach 34 by 2043. The structure is 36 ft (11 m) long and 16 ft wide. If it were closed, the detour would be 34.8 mi (56 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Na Cnty RD 402 over Corral Creek built?
It was built in 1970, making it 55 years old in 2025.
What condition is Na Cnty RD 402 over Corral Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Na Cnty RD 402 over Corral Creek carry?
About 24 vehicles per day (2024 count), of which roughly 8% are trucks.
How long is Na Cnty RD 402 over Corral Creek?
The structure is 36 ft (11 m) long with a longest span of 35 ft (10.7 m) and a deck 16 ft wide.
Who owns Na Cnty RD 402 over Corral Creek?
It is owned by the County Highway Agency.