US Bridges

I-25 Sbl over Na CR 115 (smokey Gap)

Fair

Natrona County, Wyoming · Casper - Kaycee · Structure no. DFK

Built
1980
45 years old
Condition
Fair
inspected March 2023
Type
Tee Beam
Concrete Continuous
Length
157 ft
3 main spans
Daily traffic
1,647
2024 count
Owner
State
State Highway Agency

About this bridge

I-25 Sbl over Na CR 115 (smokey Gap) is a concrete continuous tee beam carrying I-25 Sbl over Na CR 115 (smokey Gap) in Natrona County, Wyoming. It was built in 1980, so it is 45 years old, younger than the Wyoming average of 48.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,647 vehicles a day, roughly 30% of them trucks, projected to reach 2,306 by 2043. The structure is 157 ft (47.9 m) long and 45 ft wide.

CarriesI-25 Sbl
CrossesNa CR 115 (smokey Gap)
LocationCasper - Kaycee
RouteInterstate 25
StateWyoming
Coordinates43.41925, -106.38579
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58 US tons
Inventory rating34.9 US tons

Structure

Structure typeTee Beam
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length157 ft (47.9 m)
Longest span61 ft (18.6 m)
Deck width45 ft (13.6 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,647 (2024)
Projected traffic2,306 by 2043
Trucks30%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-25 Sbl over Na CR 115 (smokey Gap) built?

It was built in 1980, making it 45 years old in 2025.

What condition is I-25 Sbl over Na CR 115 (smokey Gap) in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does I-25 Sbl over Na CR 115 (smokey Gap) carry?

About 1,647 vehicles per day (2024 count), of which roughly 30% are trucks.

How long is I-25 Sbl over Na CR 115 (smokey Gap)?

The structure is 157 ft (47.9 m) long with a longest span of 61 ft (18.6 m) and a deck 45 ft wide.

Who owns I-25 Sbl over Na CR 115 (smokey Gap)?

It is owned by the State Highway Agency.