US Bridges

Parsley Blvd over I-80

Good

Laramie County, Wyoming · Cheyenne Marginal · Structure no. NEL

Built
2022
3 years old
Condition
Good
inspected January 2025
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
250 ft
4 main spans
Daily traffic
3,045
2024 count
Owner
State
State Highway Agency

About this bridge

Parsley Blvd over I-80 is a steel continuous stringer/multi-beam or girder carrying Parsley Blvd over I-80 in Laramie County, Wyoming. It was built in 2022, so it is 3 years old, younger than the Wyoming average of 48.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,045 vehicles a day, roughly 9% of them trucks, projected to reach 4,263 by 2043. The structure is 250 ft (76.2 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesParsley Blvd
CrossesI-80
LocationCheyenne Marginal
RouteCity Street 4017
StateWyoming
Coordinates41.116, -104.8288
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment7: Better than present minimum criteria
Operating rating88.6 US tons
Inventory rating68.2 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length250 ft (76.2 m)
Longest span77 ft (23.5 m)
Deck width46 ft (14 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic3,045 (2024)
Projected traffic4,263 by 2043
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Parsley Blvd over I-80 built?

It was built in 2022, making it 3 years old in 2025.

What condition is Parsley Blvd over I-80 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does Parsley Blvd over I-80 carry?

About 3,045 vehicles per day (2024 count), of which roughly 9% are trucks.

How long is Parsley Blvd over I-80?

The structure is 250 ft (76.2 m) long with a longest span of 77 ft (23.5 m) and a deck 46 ft wide.

Who owns Parsley Blvd over I-80?

It is owned by the State Highway Agency.