I-80 Ebl over LA CR 164-1 (beech St)
GoodLaramie County, Wyoming · Cheyenne - Nebraska Line · Structure no. MUT
- Built
- 2016
- 9 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 160 ft
- 3 main spans
- Daily traffic
- 4,939
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-80 Ebl over LA CR 164-1 (beech St) is a steel continuous stringer/multi-beam or girder carrying I-80 Ebl over LA CR 164-1 (beech St) in Laramie County, Wyoming. It was built in 2016, so it is 9 years old, younger than the Wyoming average of 48.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,939 vehicles a day, roughly 53% of them trucks, projected to reach 6,915 by 2043. The structure is 160 ft (48.8 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-80 Ebl over LA CR 164-1 (beech St) built?
It was built in 2016, making it 9 years old in 2025.
What condition is I-80 Ebl over LA CR 164-1 (beech St) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does I-80 Ebl over LA CR 164-1 (beech St) carry?
About 4,939 vehicles per day (2024 count), of which roughly 53% are trucks.
How long is I-80 Ebl over LA CR 164-1 (beech St)?
The structure is 160 ft (48.8 m) long with a longest span of 80 ft (24.4 m) and a deck 43 ft wide.
Who owns I-80 Ebl over LA CR 164-1 (beech St)?
It is owned by the State Highway Agency.