US Bridges

I-80 Ebl over LA CR 164-1 (beech St)

Good

Laramie County, Wyoming · Cheyenne - Nebraska Line · Structure no. MUT

Built
2016
9 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
160 ft
3 main spans
Daily traffic
4,939
2024 count
Owner
State
State Highway Agency

About this bridge

I-80 Ebl over LA CR 164-1 (beech St) is a steel continuous stringer/multi-beam or girder carrying I-80 Ebl over LA CR 164-1 (beech St) in Laramie County, Wyoming. It was built in 2016, so it is 9 years old, younger than the Wyoming average of 48.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,939 vehicles a day, roughly 53% of them trucks, projected to reach 6,915 by 2043. The structure is 160 ft (48.8 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-80 Ebl
CrossesLA CR 164-1 (beech St)
LocationCheyenne - Nebraska Line
RouteInterstate 80
StateWyoming
Coordinates41.17495, -104.06306
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating88.2 US tons
Inventory rating67.9 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length160 ft (48.8 m)
Longest span80 ft (24.4 m)
Deck width43 ft (13.2 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,939 (2024)
Projected traffic6,915 by 2043
Trucks53%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-80 Ebl over LA CR 164-1 (beech St) built?

It was built in 2016, making it 9 years old in 2025.

What condition is I-80 Ebl over LA CR 164-1 (beech St) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does I-80 Ebl over LA CR 164-1 (beech St) carry?

About 4,939 vehicles per day (2024 count), of which roughly 53% are trucks.

How long is I-80 Ebl over LA CR 164-1 (beech St)?

The structure is 160 ft (48.8 m) long with a longest span of 80 ft (24.4 m) and a deck 43 ft wide.

Who owns I-80 Ebl over LA CR 164-1 (beech St)?

It is owned by the State Highway Agency.