LA Cnty RD 123-2 over North Fork Bear Creek
GoodLaramie County, Wyoming · 45 Miles N. of Cheyenne · Structure no. FKS
- Built
- 1986
- 39 years old
- Condition
- Good
- inspected December 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 80 ft
- 1 main span
- Daily traffic
- 284
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
LA Cnty RD 123-2 over North Fork Bear Creek is a prestressed concrete box beam or girders - multiple carrying LA Cnty RD 123-2 over North Fork Bear Creek in Laramie County, Wyoming. It was built in 1986, so it is 39 years old, younger than the Wyoming average of 48.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 284 vehicles a day, roughly 20% of them trucks, projected to reach 398 by 2043. The structure is 80 ft (24.4 m) long and 28 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was LA Cnty RD 123-2 over North Fork Bear Creek built?
It was built in 1986, making it 39 years old in 2025.
What condition is LA Cnty RD 123-2 over North Fork Bear Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.
How much traffic does LA Cnty RD 123-2 over North Fork Bear Creek carry?
About 284 vehicles per day (2024 count), of which roughly 20% are trucks.
How long is LA Cnty RD 123-2 over North Fork Bear Creek?
The structure is 80 ft (24.4 m) long with a longest span of 77 ft (23.5 m) and a deck 28 ft wide.
Who owns LA Cnty RD 123-2 over North Fork Bear Creek?
It is owned by the County Highway Agency.