I-80 Ebl over South Greeley Highway
PoorLaramie County, Wyoming · Cheyenne Marginal · Structure no. AZI
- Built
- 1966
- 59 years old
- Condition
- Poor
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 207 ft
- 3 main spans
- Daily traffic
- 10,938
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-80 Ebl over South Greeley Highway is a steel continuous stringer/multi-beam or girder carrying I-80 Ebl over South Greeley Highway in Laramie County, Wyoming. It was built in 1966, so it is 59 years old, older than the Wyoming average of 48.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 10,938 vehicles a day, roughly 32% of them trucks, projected to reach 15,313 by 2043. The structure is 207 ft (63.1 m) long and 41 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-80 Ebl over South Greeley Highway built?
It was built in 1966, making it 59 years old in 2025.
What condition is I-80 Ebl over South Greeley Highway in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in January 2024.
How much traffic does I-80 Ebl over South Greeley Highway carry?
About 10,938 vehicles per day (2024 count), of which roughly 32% are trucks.
How long is I-80 Ebl over South Greeley Highway?
The structure is 207 ft (63.1 m) long with a longest span of 96 ft (29.3 m) and a deck 41 ft wide.
Who owns I-80 Ebl over South Greeley Highway?
It is owned by the State Highway Agency.