I-25 Nbl over LA CR 218-2 (farris Rd)
FairLaramie County, Wyoming · Cheyenne - Chugwater · Structure no. ABR
- Built
- 1970
- 55 years old
- Condition
- Fair
- inspected March 2024
- Type
- Tee Beam
- Concrete Continuous
- Length
- 134 ft
- 3 main spans
- Daily traffic
- 3,363
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-25 Nbl over LA CR 218-2 (farris Rd) is a concrete continuous tee beam carrying I-25 Nbl over LA CR 218-2 (farris Rd) in Laramie County, Wyoming. It was built in 1970, so it is 55 years old, older than the Wyoming average of 48.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,363 vehicles a day, roughly 22% of them trucks, projected to reach 4,708 by 2043. The structure is 134 ft (40.8 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-25 Nbl over LA CR 218-2 (farris Rd) built?
It was built in 1970, making it 55 years old in 2025.
What condition is I-25 Nbl over LA CR 218-2 (farris Rd) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does I-25 Nbl over LA CR 218-2 (farris Rd) carry?
About 3,363 vehicles per day (2024 count), of which roughly 22% are trucks.
How long is I-25 Nbl over LA CR 218-2 (farris Rd)?
The structure is 134 ft (40.8 m) long with a longest span of 56 ft (17.1 m) and a deck 45 ft wide.
Who owns I-25 Nbl over LA CR 218-2 (farris Rd)?
It is owned by the State Highway Agency.