I-25 Nbl over BNSF Railway
FairLaramie County, Wyoming · Cheyenne Marginal · Structure no. ABE
- Built
- 1958
- 67 years old
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 191 ft
- 3 main spans
- Daily traffic
- 12,642
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-25 Nbl over BNSF Railway is a steel stringer/multi-beam or girder carrying I-25 Nbl over BNSF Railway in Laramie County, Wyoming. It was built in 1958, so it is 67 years old, older than the Wyoming average of 48.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 12,642 vehicles a day, roughly 9% of them trucks, projected to reach 17,699 by 2043. The structure is 191 ft (58.2 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-25 Nbl over BNSF Railway built?
It was built in 1958, making it 67 years old in 2025.
What condition is I-25 Nbl over BNSF Railway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does I-25 Nbl over BNSF Railway carry?
About 12,642 vehicles per day (2024 count), of which roughly 9% are trucks.
How long is I-25 Nbl over BNSF Railway?
The structure is 191 ft (58.2 m) long with a longest span of 86 ft (26.1 m) and a deck 45 ft wide.
Who owns I-25 Nbl over BNSF Railway?
It is owned by the State Highway Agency.