Jo Cnty RD 252 over Clear Creek
FairPosted for loadJohnson County, Wyoming · Buffalo · Structure no. EES
- Built
- 1955
- 70 years old
- Condition
- Fair
- inspected March 2024
- Type
- Frame
- Concrete Continuous
- Length
- 88 ft
- 2 main spans
- Daily traffic
- 2,582
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Jo Cnty RD 252 over Clear Creek is a concrete continuous frame carrying Jo Cnty RD 252 over Clear Creek in Johnson County, Wyoming. It was built in 1955, so it is 70 years old, older than the Wyoming average of 48.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 2,582 vehicles a day, roughly 1% of them trucks, projected to reach 3,615 by 2043. The structure is 88 ft (26.8 m) long and 40 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Jo Cnty RD 252 over Clear Creek built?
It was built in 1955, making it 70 years old in 2025.
What condition is Jo Cnty RD 252 over Clear Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Jo Cnty RD 252 over Clear Creek carry?
About 2,582 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is Jo Cnty RD 252 over Clear Creek?
The structure is 88 ft (26.8 m) long with a longest span of 42 ft (12.8 m) and a deck 40 ft wide.
Who owns Jo Cnty RD 252 over Clear Creek?
It is owned by the County Highway Agency.