I-90 Ebl over Powder River
FairJohnson County, Wyoming · Buffalo - Gillette · Structure no. BET
- Built
- 1961
- 64 years old, rebuilt 1991
- Condition
- Fair
- inspected April 2023
- Type
- Girder and Floorbeam System
- Steel Continuous
- Length
- 525 ft
- 3 main spans
- Daily traffic
- 1,808
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-90 Ebl over Powder River is a steel continuous girder and floorbeam system carrying I-90 Ebl over Powder River in Johnson County, Wyoming. It was built in 1961 and reconstructed in 1991, so it is 64 years old, older than the Wyoming average of 48.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,808 vehicles a day, roughly 24% of them trucks, projected to reach 2,531 by 2043. The structure is 525 ft (159.9 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-90 Ebl over Powder River built?
It was built in 1961, making it 64 years old in 2025. It was reconstructed in 1991.
What condition is I-90 Ebl over Powder River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does I-90 Ebl over Powder River carry?
About 1,808 vehicles per day (2024 count), of which roughly 24% are trucks.
How long is I-90 Ebl over Powder River?
The structure is 525 ft (159.9 m) long with a longest span of 200 ft (61 m) and a deck 41 ft wide.
Who owns I-90 Ebl over Powder River?
It is owned by the State Highway Agency.