US Bridges

US 85 Bypass over BNSF Railway / US 26

Fair

Goshen County, Wyoming · Torrington Streets · Structure no. MHB

Built
2013
12 years old
Condition
Fair
inspected April 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
300 ft
4 main spans
Daily traffic
1,656
2024 count
Owner
State
State Highway Agency

About this bridge

US 85 Bypass over BNSF Railway / US 26 is a steel continuous stringer/multi-beam or girder carrying US 85 Bypass over BNSF Railway / US 26 in Goshen County, Wyoming. It was built in 2013, so it is 12 years old, younger than the Wyoming average of 48.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,656 vehicles a day, roughly 21% of them trucks, projected to reach 2,318 by 2043. The structure is 300 ft (91.4 m) long and 79 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 85 Bypass
CrossesBNSF Railway / US 26
LocationTorrington Streets
RouteU.S. Route 85
StateWyoming
Coordinates42.05858, -104.17693
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating57.1 US tons
Inventory rating44 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length300 ft (91.4 m)
Longest span100 ft (30.5 m)
Deck width79 ft (24.1 m)
Roadway width64 ft (19.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,656 (2024)
Projected traffic2,318 by 2043
Trucks21%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway and railroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 85 Bypass over BNSF Railway / US 26 built?

It was built in 2013, making it 12 years old in 2025.

What condition is US 85 Bypass over BNSF Railway / US 26 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does US 85 Bypass over BNSF Railway / US 26 carry?

About 1,656 vehicles per day (2024 count), of which roughly 21% are trucks.

How long is US 85 Bypass over BNSF Railway / US 26?

The structure is 300 ft (91.4 m) long with a longest span of 100 ft (30.5 m) and a deck 79 ft wide.

Who owns US 85 Bypass over BNSF Railway / US 26?

It is owned by the State Highway Agency.