US Bridges

IRR BIA RTE 78 over Little Wind River

Good

Fremont County, Wyoming · 2 KM SW of Arapahoe Schoo · Structure no. 00000000000C840

Built
2010
15 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
144 ft
3 main spans
Daily traffic
1,500
2022 count
Owner
Federal
Bureau of Indian Affairs

About this bridge

IRR BIA RTE 78 over Little Wind River is a steel continuous stringer/multi-beam or girder carrying IRR BIA RTE 78 over Little Wind River in Fremont County, Wyoming. It was built in 2010, so it is 15 years old, younger than the Wyoming average of 48.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,500 vehicles a day, roughly 5% of them trucks, projected to reach 1,750 by 2044. The structure is 144 ft (43.9 m) long and 39 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesIRR BIA RTE 78
CrossesLittle Wind River
Location2 KM SW of Arapahoe Schoo
RouteFederal Lands Road 78
StateWyoming
Coordinates42.96003, -108.49903
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating77.7 US tons
Inventory rating60.1 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length144 ft (43.9 m)
Longest span57 ft (17.3 m)
Deck width39 ft (12 m)
Roadway width37 ft (11.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,500 (2022)
Projected traffic1,750 by 2044
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerBureau of Indian Affairs
Maintained byBureau of Indian Affairs
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IRR BIA RTE 78 over Little Wind River built?

It was built in 2010, making it 15 years old in 2025.

What condition is IRR BIA RTE 78 over Little Wind River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does IRR BIA RTE 78 over Little Wind River carry?

About 1,500 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is IRR BIA RTE 78 over Little Wind River?

The structure is 144 ft (43.9 m) long with a longest span of 57 ft (17.3 m) and a deck 39 ft wide.

Who owns IRR BIA RTE 78 over Little Wind River?

It is owned by the Bureau of Indian Affairs.