CR Cnty RD 129 over Sand Creek
GoodCrook County, Wyoming · 4.0 Mi. S.W of Beulah · Structure no. NAV
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected March 2023
- Type
- Slab
- Prestressed Concrete
- Length
- 65 ft
- 1 main span
- Daily traffic
- 133
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
CR Cnty RD 129 over Sand Creek is a prestressed concrete slab carrying CR Cnty RD 129 over Sand Creek in Crook County, Wyoming. It was built in 2017, so it is 8 years old, younger than the Wyoming average of 48.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 133 vehicles a day, roughly 49% of them trucks, projected to reach 186 by 2043. The structure is 65 ft (19.8 m) long and 28 ft wide. If it were closed, the detour would be 23 mi (37 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR Cnty RD 129 over Sand Creek built?
It was built in 2017, making it 8 years old in 2025.
What condition is CR Cnty RD 129 over Sand Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does CR Cnty RD 129 over Sand Creek carry?
About 133 vehicles per day (2024 count), of which roughly 49% are trucks.
How long is CR Cnty RD 129 over Sand Creek?
The structure is 65 ft (19.8 m) long and a deck 28 ft wide.
Who owns CR Cnty RD 129 over Sand Creek?
It is owned by the County Highway Agency.