US Bridges

I-25 Sbl over CR 18 (mormon Canyon Rd)

Good

Converse County, Wyoming · Douglas - Casper · Structure no. AHC

Built
1967
58 years old
Condition
Good
inspected March 2024
Type
Tee Beam
Concrete Continuous
Length
97 ft
3 main spans
Daily traffic
4,838
2024 count
Owner
State
State Highway Agency

About this bridge

I-25 Sbl over CR 18 (mormon Canyon Rd) is a concrete continuous tee beam carrying I-25 Sbl over CR 18 (mormon Canyon Rd) in Converse County, Wyoming. It was built in 1967, so it is 58 years old, older than the Wyoming average of 48.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,838 vehicles a day, roughly 17% of them trucks, projected to reach 6,773 by 2043. The structure is 97 ft (29.6 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-25 Sbl
CrossesCR 18 (mormon Canyon Rd)
LocationDouglas - Casper
RouteInterstate 25
StateWyoming
Coordinates42.8359, -105.85549
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.7 US tons
Inventory rating32.4 US tons

Structure

Structure typeTee Beam
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length97 ft (29.6 m)
Longest span37 ft (11.3 m)
Deck width40 ft (12.3 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,838 (2024)
Projected traffic6,773 by 2043
Trucks17%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-25 Sbl over CR 18 (mormon Canyon Rd) built?

It was built in 1967, making it 58 years old in 2025.

What condition is I-25 Sbl over CR 18 (mormon Canyon Rd) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does I-25 Sbl over CR 18 (mormon Canyon Rd) carry?

About 4,838 vehicles per day (2024 count), of which roughly 17% are trucks.

How long is I-25 Sbl over CR 18 (mormon Canyon Rd)?

The structure is 97 ft (29.6 m) long with a longest span of 37 ft (11.3 m) and a deck 40 ft wide.

Who owns I-25 Sbl over CR 18 (mormon Canyon Rd)?

It is owned by the State Highway Agency.