I-25 Sbl over CO CR 1 (irvine Road)
FairConverse County, Wyoming · Douglas Marginal · Structure no. AFY
- Built
- 1967
- 58 years old
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 179 ft
- 4 main spans
- Daily traffic
- 4,416
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-25 Sbl over CO CR 1 (irvine Road) is a steel continuous stringer/multi-beam or girder carrying I-25 Sbl over CO CR 1 (irvine Road) in Converse County, Wyoming. It was built in 1967, so it is 58 years old, older than the Wyoming average of 48.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,416 vehicles a day, roughly 25% of them trucks, projected to reach 6,182 by 2043. The structure is 179 ft (54.7 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-25 Sbl over CO CR 1 (irvine Road) built?
It was built in 1967, making it 58 years old in 2025.
What condition is I-25 Sbl over CO CR 1 (irvine Road) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does I-25 Sbl over CO CR 1 (irvine Road) carry?
About 4,416 vehicles per day (2024 count), of which roughly 25% are trucks.
How long is I-25 Sbl over CO CR 1 (irvine Road)?
The structure is 179 ft (54.7 m) long with a longest span of 52 ft (15.7 m) and a deck 41 ft wide.
Who owns I-25 Sbl over CO CR 1 (irvine Road)?
It is owned by the State Highway Agency.