US Bridges

I-80 Ebl over Wyo 130

Fair

Carbon County, Wyoming · Rawlins - Laramie · Structure no. AUQ

Built
1969
56 years old
Condition
Fair
inspected May 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
174 ft
3 main spans
Daily traffic
6,594
2024 count
Owner
State
State Highway Agency

About this bridge

I-80 Ebl over Wyo 130 is a steel continuous stringer/multi-beam or girder carrying I-80 Ebl over Wyo 130 in Carbon County, Wyoming. It was built in 1969, so it is 56 years old, older than the Wyoming average of 48.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,594 vehicles a day, roughly 54% of them trucks, projected to reach 9,232 by 2043. The structure is 174 ft (53 m) long and 43 ft wide.

CarriesI-80 Ebl
CrossesWyo 130
LocationRawlins - Laramie
RouteInterstate 80
StateWyoming
Coordinates41.74115, -106.83058
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.7 US tons
Inventory rating32.8 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length174 ft (53 m)
Longest span67 ft (20.4 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,594 (2024)
Projected traffic9,232 by 2043
Trucks54%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$8,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-80 Ebl over Wyo 130 built?

It was built in 1969, making it 56 years old in 2025.

What condition is I-80 Ebl over Wyo 130 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does I-80 Ebl over Wyo 130 carry?

About 6,594 vehicles per day (2024 count), of which roughly 54% are trucks.

How long is I-80 Ebl over Wyo 130?

The structure is 174 ft (53 m) long with a longest span of 67 ft (20.4 m) and a deck 43 ft wide.

Who owns I-80 Ebl over Wyo 130?

It is owned by the State Highway Agency.