CO Rt 28/2 over Walker Creek
PoorWood County, West Virginia · 0.76 MI W CR 28 · Structure no. 00000000054A081
- Built
- 1959
- 66 years old, rebuilt 2002
- Condition
- Poor
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 30 ft
- 1 main span
- Daily traffic
- 20
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
CO Rt 28/2 over Walker Creek is a steel stringer/multi-beam or girder carrying CO Rt 28/2 over Walker Creek in Wood County, West Virginia. It was built in 1959 and reconstructed in 2002, so it is 66 years old, older than the West Virginia average of 44.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 20 vehicles a day, projected to reach 30 by 2042. The structure is 30 ft (9.1 m) long and 16 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CO Rt 28/2 over Walker Creek built?
It was built in 1959, making it 66 years old in 2025. It was reconstructed in 2002.
What condition is CO Rt 28/2 over Walker Creek in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in November 2023.
How much traffic does CO Rt 28/2 over Walker Creek carry?
About 20 vehicles per day (2022 count).
How long is CO Rt 28/2 over Walker Creek?
The structure is 30 ft (9.1 m) long with a longest span of 29 ft (8.7 m) and a deck 16 ft wide.
Who owns CO Rt 28/2 over Walker Creek?
It is owned by the State Highway Agency.