County Route 15 over North Fork of Fishing CR
GoodWetzel County, West Virginia · 0.84 Mi. East JCT Wv 20 · Structure no. 00000000052A145
- Built
- 2007
- 18 years old
- Condition
- Good
- inspected May 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 165 ft
- 1 main span
- Daily traffic
- 700
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
County Route 15 over North Fork of Fishing CR is a prestressed concrete box beam or girders - multiple carrying County Route 15 over North Fork of Fishing CR in Wetzel County, West Virginia. It was built in 2007, so it is 18 years old, younger than the West Virginia average of 44.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 700 vehicles a day, roughly 8% of them trucks, projected to reach 959 by 2043. The structure is 165 ft (50.2 m) long and 40 ft wide. If it were closed, the detour would be 29.8 mi (48 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Route 15 over North Fork of Fishing CR built?
It was built in 2007, making it 18 years old in 2025.
What condition is County Route 15 over North Fork of Fishing CR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does County Route 15 over North Fork of Fishing CR carry?
About 700 vehicles per day (2023 count), of which roughly 8% are trucks.
How long is County Route 15 over North Fork of Fishing CR?
The structure is 165 ft (50.2 m) long with a longest span of 82 ft (25 m) and a deck 40 ft wide.
Who owns County Route 15 over North Fork of Fishing CR?
It is owned by the State Highway Agency.