US Bridges

W.V. 72 over U.S. 48

Good

Tucker County, West Virginia · 1.15 MI N of CR 17 · Structure no. 00000000047A097

Built
2023
2 years old
Condition
Good
inspected October 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
129 ft
1 main span
Daily traffic
2,500
2022 count
Owner
State
State Highway Agency

About this bridge

W.V. 72 over U.S. 48 is a prestressed concrete box beam or girders - multiple carrying W.V. 72 over U.S. 48 in Tucker County, West Virginia. It was built in 2023, so it is 2 years old, younger than the West Virginia average of 44.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,500 vehicles a day, roughly 13% of them trucks, projected to reach 2,930 by 2042. The structure is 129 ft (39.3 m) long and 54 ft wide.

CarriesW.V. 72
CrossesU.S. 48
Location1.15 MI N of CR 17
RouteState Highway 7200
Coordinates39.11372, -79.67819
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating76.9 US tons
Inventory rating46 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length129 ft (39.3 m)
Longest span129 ft (39.3 m)
Deck width54 ft (16.6 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,500 (2022)
Projected traffic2,930 by 2042
Trucks13%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was W.V. 72 over U.S. 48 built?

It was built in 2023, making it 2 years old in 2025.

What condition is W.V. 72 over U.S. 48 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does W.V. 72 over U.S. 48 carry?

About 2,500 vehicles per day (2022 count), of which roughly 13% are trucks.

How long is W.V. 72 over U.S. 48?

The structure is 129 ft (39.3 m) long with a longest span of 129 ft (39.3 m) and a deck 54 ft wide.

Who owns W.V. 72 over U.S. 48?

It is owned by the State Highway Agency.