Taylor CO Rt 50/9 over Three Fork Creek
GoodTaylor County, West Virginia · 1.12 MI East US Rt 119 · Structure no. 00000000046A090
- Built
- 2008
- 17 years old
- Condition
- Good
- inspected October 2022
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 153 ft
- 2 main spans
- Daily traffic
- 50
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Taylor CO Rt 50/9 over Three Fork Creek is a steel continuous stringer/multi-beam or girder carrying Taylor CO Rt 50/9 over Three Fork Creek in Taylor County, West Virginia. It was built in 2008, so it is 17 years old, younger than the West Virginia average of 44.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 50 vehicles a day, roughly 8% of them trucks, projected to reach 90 by 2041. The structure is 153 ft (46.6 m) long and 25 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Taylor CO Rt 50/9 over Three Fork Creek built?
It was built in 2008, making it 17 years old in 2025.
What condition is Taylor CO Rt 50/9 over Three Fork Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2022.
How much traffic does Taylor CO Rt 50/9 over Three Fork Creek carry?
About 50 vehicles per day (2020 count), of which roughly 8% are trucks.
How long is Taylor CO Rt 50/9 over Three Fork Creek?
The structure is 153 ft (46.6 m) long with a longest span of 75 ft (22.9 m) and a deck 25 ft wide.
Who owns Taylor CO Rt 50/9 over Three Fork Creek?
It is owned by the State Highway Agency.