County Route 7/1 over Meadow Creek
FairSummers County, West Virginia · 4.13 Miles E. of CR 7 · Structure no. 00000000045A019
- Built
- 1989
- 36 years old
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 42 ft
- 1 main span
- Daily traffic
- 50
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
County Route 7/1 over Meadow Creek is a steel stringer/multi-beam or girder carrying County Route 7/1 over Meadow Creek in Summers County, West Virginia. It was built in 1989, so it is 36 years old, younger than the West Virginia average of 44.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 50 vehicles a day, roughly 5% of them trucks, projected to reach 63 by 2039. The structure is 42 ft (12.9 m) long and 20 ft wide. If it were closed, the detour would be 19.9 mi (32 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Route 7/1 over Meadow Creek built?
It was built in 1989, making it 36 years old in 2025.
What condition is County Route 7/1 over Meadow Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does County Route 7/1 over Meadow Creek carry?
About 50 vehicles per day (2019 count), of which roughly 5% are trucks.
How long is County Route 7/1 over Meadow Creek?
The structure is 42 ft (12.9 m) long with a longest span of 38 ft (11.6 m) and a deck 20 ft wide.
Who owns County Route 7/1 over Meadow Creek?
It is owned by the State Highway Agency.