County Route 25 over Piney Creek
FairRaleigh County, West Virginia · 0.40 Mile N of CO 25/2 · Structure no. 00000000041A301
- Built
- 2009
- 16 years old
- Condition
- Fair
- inspected January 2024
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 42 ft
- 1 main span
- Daily traffic
- 750
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
County Route 25 over Piney Creek is a prestressed concrete box beam or girders - single or spread carrying County Route 25 over Piney Creek in Raleigh County, West Virginia. It was built in 2009, so it is 16 years old, younger than the West Virginia average of 44.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 750 vehicles a day, roughly 6% of them trucks, projected to reach 1,380 by 2042. The structure is 42 ft (12.7 m) long and 24 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Route 25 over Piney Creek built?
It was built in 2009, making it 16 years old in 2025.
What condition is County Route 25 over Piney Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does County Route 25 over Piney Creek carry?
About 750 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is County Route 25 over Piney Creek?
The structure is 42 ft (12.7 m) long with a longest span of 38 ft (11.6 m) and a deck 24 ft wide.
Who owns County Route 25 over Piney Creek?
It is owned by the State Highway Agency.