Preston CO Rt 98 over Snowy Creek
GoodPreston County, West Virginia · 0.19 MI South Wv Rt 7 · Structure no. 00000000039A174
- Built
- 1988
- 37 years old
- Condition
- Good
- inspected April 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 50 ft
- 1 main span
- Daily traffic
- 10
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Preston CO Rt 98 over Snowy Creek is a prestressed concrete box beam or girders - multiple carrying Preston CO Rt 98 over Snowy Creek in Preston County, West Virginia. It was built in 1988, so it is 37 years old, younger than the West Virginia average of 44.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 10 vehicles a day, projected to reach 14 by 2041. The structure is 50 ft (15.1 m) long and 15 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Preston CO Rt 98 over Snowy Creek built?
It was built in 1988, making it 37 years old in 2025.
What condition is Preston CO Rt 98 over Snowy Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does Preston CO Rt 98 over Snowy Creek carry?
About 10 vehicles per day (2020 count).
How long is Preston CO Rt 98 over Snowy Creek?
The structure is 50 ft (15.1 m) long with a longest span of 48 ft (14.6 m) and a deck 15 ft wide.
Who owns Preston CO Rt 98 over Snowy Creek?
It is owned by the State Highway Agency.