US Bridges

Wv Route 92 over Preston CO Rt 64

Fair

Preston County, West Virginia · 0.01 MI North CO Rt 33 · Structure no. 00000000039A163

Built
1936
89 years old
Condition
Fair
inspected March 2023
Type
Culvert
Concrete
Length
20 ft
1 main span
Daily traffic
2,300
2019 count
Owner
State
State Highway Agency

About this bridge

Wv Route 92 over Preston CO Rt 64 is a concrete culvert carrying Wv Route 92 over Preston CO Rt 64 in Preston County, West Virginia. It was built in 1936, so it is 89 years old, older than the West Virginia average of 44.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,300 vehicles a day, roughly 11% of them trucks, projected to reach 2,410 by 2041. The structure is 20 ft (6.1 m) long.

CarriesWv Route 92
CrossesPreston CO Rt 64
Location0.01 MI North CO Rt 33
RouteState Highway 9200
Coordinates39.38744, -79.84928
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Culvert5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment7: Better than present minimum criteria
Operating rating70 US tons
Inventory rating32 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadUnknown
Structure length20 ft (6.1 m)
Longest span20 ft (6.1 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,300 (2019)
Projected traffic2,410 by 2041
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Wv Route 92 over Preston CO Rt 64 built?

It was built in 1936, making it 89 years old in 2025.

What condition is Wv Route 92 over Preston CO Rt 64 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does Wv Route 92 over Preston CO Rt 64 carry?

About 2,300 vehicles per day (2019 count), of which roughly 11% are trucks.

How long is Wv Route 92 over Preston CO Rt 64?

The structure is 20 ft (6.1 m) long with a longest span of 20 ft (6.1 m).

Who owns Wv Route 92 over Preston CO Rt 64?

It is owned by the State Highway Agency.