County Route 13 over Hominy Creek
FairNicholas County, West Virginia · 0.02 Miles E. of CR 13/5 · Structure no. 00000000034A017
- Built
- 1992
- 33 years old
- Condition
- Fair
- inspected February 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 84 ft
- 1 main span
- Daily traffic
- 150
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
County Route 13 over Hominy Creek is a prestressed concrete box beam or girders - multiple carrying County Route 13 over Hominy Creek in Nicholas County, West Virginia. It was built in 1992, so it is 33 years old, younger than the West Virginia average of 44.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 150 vehicles a day, roughly 6% of them trucks, projected to reach 189 by 2039. The structure is 84 ft (25.5 m) long and 28 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Route 13 over Hominy Creek built?
It was built in 1992, making it 33 years old in 2025.
What condition is County Route 13 over Hominy Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does County Route 13 over Hominy Creek carry?
About 150 vehicles per day (2019 count), of which roughly 6% are trucks.
How long is County Route 13 over Hominy Creek?
The structure is 84 ft (25.5 m) long with a longest span of 80 ft (24.4 m) and a deck 28 ft wide.
Who owns County Route 13 over Hominy Creek?
It is owned by the State Highway Agency.