County Rout 219/13 over Rock Camp Creek
FairPosted for loadMonroe County, West Virginia · 0.08 Miles W. of US 219 · Structure no. 00000000032A070
- Built
- 1953
- 72 years old
- Condition
- Fair
- inspected January 2023
- Type
- Girder and Floorbeam System
- Steel
- Length
- 41 ft
- 1 main span
- Daily traffic
- 50
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
County Rout 219/13 over Rock Camp Creek is a steel girder and floorbeam system carrying County Rout 219/13 over Rock Camp Creek in Monroe County, West Virginia. It was built in 1953, so it is 72 years old, older than the West Virginia average of 44.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 50 vehicles a day, roughly 8% of them trucks, projected to reach 61 by 2039. The structure is 41 ft (12.6 m) long and 14 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Rout 219/13 over Rock Camp Creek built?
It was built in 1953, making it 72 years old in 2025.
What condition is County Rout 219/13 over Rock Camp Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.
How much traffic does County Rout 219/13 over Rock Camp Creek carry?
About 50 vehicles per day (2019 count), of which roughly 8% are trucks.
How long is County Rout 219/13 over Rock Camp Creek?
The structure is 41 ft (12.6 m) long with a longest span of 37 ft (11.2 m) and a deck 14 ft wide.
Who owns County Rout 219/13 over Rock Camp Creek?
It is owned by the State Highway Agency.