US Bridges

Mgl CO Rt 37/2 over Pedlar Run

Good

Monongalia County, West Virginia · 0.01 MI West CO Rt 37 · Structure no. 00000000031A298

Built
2006
19 years old
Condition
Good
inspected February 2021
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
28 ft
1 main span
Daily traffic
50
2019 count
Owner
State
State Highway Agency

About this bridge

Mgl CO Rt 37/2 over Pedlar Run is a prestressed concrete box beam or girders - multiple carrying Mgl CO Rt 37/2 over Pedlar Run in Monongalia County, West Virginia. It was built in 2006, so it is 19 years old, younger than the West Virginia average of 44.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, roughly 6% of them trucks, projected to reach 70 by 2041. The structure is 28 ft (8.5 m) long and 15 ft wide.

CarriesMgl CO Rt 37/2
CrossesPedlar Run
Location0.01 MI West CO Rt 37
RouteCounty Highway 3702
Coordinates39.67241, -80.11772
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating61 US tons
Inventory rating48.9 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHL 93
Structure length28 ft (8.5 m)
Longest span24 ft (7.3 m)
Deck width15 ft (4.6 m)
Roadway width15 ft (4.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2019)
Projected traffic70 by 2041
Trucks6%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Mgl CO Rt 37/2 over Pedlar Run built?

It was built in 2006, making it 19 years old in 2025.

What condition is Mgl CO Rt 37/2 over Pedlar Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2021.

How much traffic does Mgl CO Rt 37/2 over Pedlar Run carry?

About 50 vehicles per day (2019 count), of which roughly 6% are trucks.

How long is Mgl CO Rt 37/2 over Pedlar Run?

The structure is 28 ft (8.5 m) long with a longest span of 24 ft (7.3 m) and a deck 15 ft wide.

Who owns Mgl CO Rt 37/2 over Pedlar Run?

It is owned by the State Highway Agency.