Monongalia CR 64/1 over West Run
FairMonongalia County, West Virginia · 0.04 MI South CO Rt 67/1 · Structure no. 00000000031A262
- Built
- 1970
- 55 years old
- Condition
- Fair
- inspected October 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 61 ft
- 1 main span
- Daily traffic
- 3,200
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Monongalia CR 64/1 over West Run is a prestressed concrete box beam or girders - multiple carrying Monongalia CR 64/1 over West Run in Monongalia County, West Virginia. It was built in 1970, so it is 55 years old, older than the West Virginia average of 44.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,200 vehicles a day, roughly 6% of them trucks, projected to reach 4,960 by 2041. The structure is 61 ft (18.7 m) long and 28 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Monongalia CR 64/1 over West Run built?
It was built in 1970, making it 55 years old in 2025.
What condition is Monongalia CR 64/1 over West Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Monongalia CR 64/1 over West Run carry?
About 3,200 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is Monongalia CR 64/1 over West Run?
The structure is 61 ft (18.7 m) long with a longest span of 57 ft (17.4 m) and a deck 28 ft wide.
Who owns Monongalia CR 64/1 over West Run?
It is owned by the State Highway Agency.