CR 5/2 (sls) over New Creek
FairMineral County, West Virginia · 0.16 Mi. South of CR 50/1 · Structure no. 00000000029A092
- Built
- 1919
- 106 years old, rebuilt 2016
- Condition
- Fair
- inspected February 2024
- Type
- Slab
- Concrete Continuous
- Length
- 61 ft
- 2 main spans
- Daily traffic
- 50
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
CR 5/2 (sls) over New Creek is a concrete continuous slab carrying CR 5/2 (sls) over New Creek in Mineral County, West Virginia. It was built in 1919 and reconstructed in 2016, so it is 106 years old, older than the West Virginia average of 44.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 50 vehicles a day, projected to reach 56 by 2042. The structure is 61 ft (18.7 m) long and 16 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 5/2 (sls) over New Creek built?
It was built in 1919, making it 106 years old in 2025. It was reconstructed in 2016.
What condition is CR 5/2 (sls) over New Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does CR 5/2 (sls) over New Creek carry?
About 50 vehicles per day (2022 count).
How long is CR 5/2 (sls) over New Creek?
The structure is 61 ft (18.7 m) long with a longest span of 28 ft (8.4 m) and a deck 16 ft wide.
Who owns CR 5/2 (sls) over New Creek?
It is owned by the State Highway Agency.