US Bridges

WV62 over Tombleson Run

Good

Mason County, West Virginia · 0.01 MI N of CR22 · Structure no. 00000000027A196

Built
2024
1 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
138 ft
1 main span
Daily traffic
1,500
2022 count
Owner
State
State Highway Agency

About this bridge

WV62 over Tombleson Run is a prestressed concrete stringer/multi-beam or girder carrying WV62 over Tombleson Run in Mason County, West Virginia. It was built in 2024, so it is 1 years old, younger than the West Virginia average of 44.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,500 vehicles a day, roughly 7% of them trucks, projected to reach 1,575 by 2042. The structure is 138 ft (42.1 m) long and 32 ft wide.

CarriesWV62
CrossesTombleson Run
Location0.01 MI N of CR22
RouteState Highway 62
Coordinates38.88092, -81.92372
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating40 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length138 ft (42.1 m)
Longest span0 ft (0 m)
Deck width32 ft (9.9 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,500 (2022)
Projected traffic1,575 by 2042
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was WV62 over Tombleson Run built?

It was built in 2024, making it 1 years old in 2025.

What condition is WV62 over Tombleson Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does WV62 over Tombleson Run carry?

About 1,500 vehicles per day (2022 count), of which roughly 7% are trucks.

How long is WV62 over Tombleson Run?

The structure is 138 ft (42.1 m) long and a deck 32 ft wide.

Who owns WV62 over Tombleson Run?

It is owned by the State Highway Agency.